Negotiable
The date of payment from buyers deliver within days
Zhejiang
Long-term effective
2017-12-23 19:33
165
Company Profile
Chongqing Gold Mechanical & Electrical Equipment Co., Ltd.By certification [File Integrity]
Contact:Miss Lina(Mr.)
Email:
Telephone:
Area:Zhejiang
Address:Zhejiang
Website: http://chhongyin2015.ffffhs.com/
1. Connect the measured voltage to the terminal of 1 and 2
2. External current transformer installation as graph 1: let the wire across the hole on the current transformer, and then connect the two wires of the secondary transformer to the terminal of 3 and 4 on the meter
3. Internal current transformer installation as graph 2: Let the wire across the hole on the current transformer (the direction do not impact the measure result).
4. The default display power is active power (V), Click the switch (SAM CK) can change to the reactive power (VA) and power factor(cosφ)
Aesthetic Dental PFM Co Cr Crowns Bridge
price:Negotiable
Stationary Asphalt Mixing Equipment
price:Negotiable
1500 Asphalt Mixture Mixing Equipment-gas Type
price:Negotiable
Absorbent with Leak Proof Disposable Female Dog Diapers
price:Negotiable
Used PE Pipe Extrusion Line
price:Negotiable
Aesthetic Dental PFM Co Cr Crown
price:Negotiable